Data·Citizenan agentic layer over NYC Open Data
CatalogExploreAnalyticsMapAsk the agentFindingsGuideStatus
Data from NYC Open Data via the Socrata Discovery API. Quality scores are computed from a sample and are indicative, not authoritative.
← Catalog

DOB NOW: Safety Boiler

52dp-yji6Housing & Development21 columns
Annual compliance filings for high and low pressure boilers installed in buildings. The Department of Buildings’ Boiler Unit oversees the installation and operation of New York City’s boilers. Property owners are responsible for ensuring that their boilers operate safely and are in compliance with the Building Code and all related regulations.
View on NYC Open Data↗

Quality

A91.9 / 100

From a 500-row sample across 21 columns.

completeness81/ 25% weight
consistency86/ 20% weight
accuracy97/ 20% weight
timeliness100/ 15% weight
usability100/ 20% weight
  • · Has geographic keys — joinable to other NYC datasets

Related datasets

  • Buildings Subject to HPD Jurisdiction0.39
  • DOB License Info0.38
  • Housing Litigations0.38
  • DOB NOW: Safety – Facades Compliance Filings0.37
  • Registration Contacts0.37
  • Bedbug Reporting0.36
  • DOB Safety Violations0.36
  • DOB NOW: Certificate of Occupancy0.35

Sample rows

tracking_numberboiler_idreport_typeboiler_makepressure_typeinspection_datedefects_existlff_45_dayslff_180_daysfiling_feetotal_amount_paidreport_status
2017-10000007621Y0001-1553010000007621Y0001InitialSMITHLow Pressure05/10/2017 00:00:00No00300Accepted
2017-10000823916N0001-6255

Columns

21 queryable · 21 profiled

The machine field names SoQL needs, with the publisher's own description of each.

FieldTypeDescriptionNullValues
tracking_numbertextThe tracking number for the boiler compliance filing.0%2016-10000003263Y0002-71…2016-10000005880Y0001-39…2016-10000007847Y0001-26…
boiler_idtextThe identification number for the Boiler. It's a combination of the Borough code, the DOB device number, the multiple dwelling flag, and the serial number.0%10000000BNRY000110000000BNRN000120000072016Y0001
report_typecategoricalThe type of compliance filing. Expected values: • Initial = the initial boiler compliance filing for this device in this inspection cycle • Subsequent = a subsequent filing is submitted to correct defects on a previous filing.0%InitialSubsequentBNRof 4
applicantfirst_name

Query this from your own app

GET /api/datasets/52dp-yji6
GET /api/datasets/52dp-yji6/quality
GET /api/datasets/52dp-yji6/related
GET /api/columns?dataset=52dp-yji6
10000823916N0001
Initial
WEILMCLAIN
Low Pressure
06/21/2017 00:00:00
Yes
0
0
30
0
Accepted
2017-10000826544Y0001-3196310000826544Y0001SubsequentFEDERALLow Pressure02/07/2017 00:00:00No00300Accepted
2017-10000900625Y0001-3964810000900625Y0001InitialSLANTFINLow Pressure02/26/2017 00:00:00Yes00300Accepted
2017-10000913169Y0001-1549110000913169Y0001InitialROCKMILLSLow Pressure06/22/2017 00:00:00No00300Accepted
2017-10000919714Y0001-649910000919714Y0001InitialWEILMCLAINLow Pressure05/24/2017 00:00:00No00300Accepted
2017-20000046160N0001-2563720000046160N0001InitialLAARSLow Pressure06/08/2017 00:00:00No00300Accepted
2017-20000061740Y0001-722020000061740Y0001Initial—Low Pressure02/14/2017 00:00:00Yes00300Accepted
2017-20000064720N0001-3519920000064720N0001Initial—Low Pressure04/04/2017 00:00:00No00300Accepted
2017-20000065107N0001-2126020000065107N0001InitialDUNKIRKLow Pressure07/06/2017 00:00:00No00300Accepted

Showing 12 of 14 columns. All of them are listed below.

text
First name of the person who filed the application
1%
JOHNMICHAELVINCENT
applicant_last_nametextLast name of the person who filed the application.1%CAPUTOTHOMASRUSSELL
applicant_license_typecategoricalThe license type that the applicant used to file the application. Expected values: • BB = Insurance Agency Inspector Certified by NYS • E = High Pressure Boiler Operator • O = Oil Burner Installer • P = Master Plumber1%BBOPof 5
applicant_license_numbertextThe applicant's license number on file with the Department.1%546853565578
owner_first_nametextThe first name of the building owner.1%ROBERTLENINMICHAEL
owner_last_nametextThe last name of the building owner.1%IPQBURKESWANSON
boiler_maketextThe manufacturer of the boiler.4%WEIL MCLAINFEDERALBURNHAM
boiler_modeltextThe model of the boiler.37%UNKNOWNOTHEREG-75
pressure_typecategoricalThe type of boiler: either low or high pressure.0%Low PressureHigh Pressureof 2
inspection_typecategoricalLow pressure boilers only require an external inspection. High pressure boilers require both an external and an internal inspection. Expected values: • Internal = inspection by DOB staff • External = inspection performed by an inspector hired by the building owner.1%ExternalInternalof 2
inspection_datedateDate that the boiler was inspected. Date in ISO 8601 format0%12/31/2018 00:00:0012/29/2017 00:00:0012/31/2019 00:00:00
defects_existcategoricalThis indicates if any defects were found during the inspection. Expected values: • true = Defects were found • false = Defects were not found0%NoYesof 2
lff_45_dayscategoricalInspection reports submitted to DOB after the forty-five (45) days of the annual inspection date but within twelve (12) months from the inspection date will be considered “late filings” and will be subject to the appropriate civil penalties.0%050100of 13
lff_180_dayscategoricalInspection reports submitted as Unsatisfactory (with defects) must be corrected within one hundred eighty days (180) from the initial date of inspection else the owner will be subject to the appropriate civil penalties.0%050100of 13
filing_feecategorical—0%30015of 3
total_amount_paidtextThe total amount paid for the boiler compliance filing.0%30080
report_statuscategoricalWork Flow Status for the life cycle of the filing. Expected Values: Pre-Filing, QA Review, Rejected, Accepted0%AcceptedAccepted – Civil Penalti…Pre-Filingof 18
bin_numberinteger—0%307121940921203347532