Data·Citizenan agentic layer over NYC Open Data
CatalogExploreAnalyticsMapAsk the agentFindingsGuideStatus
Data from NYC Open Data via the Socrata Discovery API. Quality scores are computed from a sample and are indicative, not authoritative.
← Catalog

Public Design Commission Annual Report

5fsv-ze7vHousing & Development12 columns
List of projects that were submitted to and reviewed by the Public Design Commission on an annual basis.
View on NYC Open Data↗

Quality

A91.9 / 100

From a 500-row sample across 11 columns.

completeness90/ 25% weight
consistency86/ 20% weight
accuracy90/ 20% weight
timeliness94/ 15% weight
usability100/ 20% weight
  • · Has geographic keys — joinable to other NYC datasets

Related datasets

  • Capital Project Schedules and Budgets0.34
  • Property Data (Buildings Information System) - Now Retired0.33
  • Affordable Housing Production by Project0.32
    joins onproject_id
  • Public Design Commission Outdoor Public Art Inventory0.32
    joins onboroughtitle
  • Buildings Selected for the Alternative Enforcement Program (AEP)0.32
  • Multiple Dwelling Registrations0.32
  • Bedbug Reporting

Geography

Has borough codes (`borough`) — joinable, but needs boundary shapes to draw.

Sample rows

meeting_dateproject_idtitleboroughlead_agencypublic_privateproject_typeconstruction_typeresultsecondary_agency
2025-12-15T00:00:00.00011788Replacement of the roof and construction of rooftop bulkheads, Heckscher Building, 1230 Fifth Avenue, ManhattanManhattanDDCPublicBuilding systems & ModificationsInstallation of specific elementsCommented—
2025-12-15T00:00:00.00020880

Columns

12 queryable · 12 profiled

The machine field names SoQL needs, with the publisher's own description of each.

FieldTypeDescriptionNullValues
meeting_datedatetimeThe Commission meeting date that corresponds with the month during which a project was submitted.0%2017-05-22T00:00:00.0002020-03-30T00:00:00.0002017-06-19T00:00:00.000
project_idtextUnique identifier for an individual project.0%NULL1703517460
titletextName assigned to an individual project including the construction type, scope and location.0%Reconstruction of the Br…Construction of a mixed-…Reconstruction of the Up…
boroughcategorical

Query this from your own app

GET /api/datasets/5fsv-ze7v
GET /api/datasets/5fsv-ze7v/quality
GET /api/datasets/5fsv-ze7v/related
GET /api/columns?dataset=5fsv-ze7v
0.31
joins onborough
  • DOB NOW: Certificate of Occupancy0.31
    joins onborough
  • Rehabilitation of the East New York Industrial Building, 191-201 Powell Street, Brooklyn
    Brooklyn
    EDC
    Public
    Architecture
    Rehabilitation
    Commented
    —
    2025-12-15T00:00:00.00020959Construction of streetscape improvements, including reconstruction of an entrance at Our Lady of Lourdes Church and Corporal Allan F. Kivlehan Park, between Milton Avenue, New Dorp Lane, Cedar Grove Avenue, Ebbits Street, and Hetts Avenue, Staten IslandStaten IslandDDCPublicLandscape architectureConstructionCommentedDOT/DPR
    2025-12-15T00:00:00.00021265Installation of rooftop mechanical equipment, Main Building, Oakwood Beach Wastewater Resource Recovery Facility, 751 Mill Road, Staten IslandStaten IslandDEPPublicBuilding systems & ModificationsInstallation of specific elementsCommented—
    2025-12-15T00:00:00.00021431Replacement of the roof and installation of rooftop mechanical equipment, Ryder Library, 5902 23rd Avenue, BrooklynBrooklynDDCPublicBuilding systems & ModificationsInstallation of specific elementsCommented—
    2025-12-15T00:00:00.00021876Installation of rooftop mechanical equipment and an exhaust fan, Engine Company 22, 159 East 85th Street, ManhattanManhattanFDNYPublicBuilding systems & ModificationsInstallation of specific elementsCommented—
    2025-12-15T00:00:00.00021976Reconstruction of the bulkheads and adjacent site work, Tallman Island Wastewater Resource Recovery Facility, 127th Street and Powell's Cove Boulevard, College Point, QueensQueensDEPPublicBuilding systems & ModificationsReconstructionCommented—
    2025-12-15T00:00:00.00022101Construction of streetscape improvements, Bush Terminal Industrial Campus (Made in NY), between 41st Street, 1st Avenue, and 44th Street, and the waterfront, BrooklynBrooklynEDCPublicLandscape architectureConstructionCommented—
    2025-12-15T00:00:00.00022414Construction of a restaurant, parking lot, and adjacent site work, 2 Soundview Avenue, Clason Point Park, Bronx River Avenue, East River, BronxBronxDPRPublicArchitectureConstructionCommented—
    2025-12-15T00:00:00.00022417Installation of an interim guard booth, doors, and fencing, Kings County Criminal Court, State Street between Boerum Place and Smith Street, BrooklynBrooklynDDCPublicBuilding systems & ModificationsInstallation of specific elementsCommented—
    —
    0%
    BrooklynManhattanQueensof 12
    lead_agencytextThe City agency or agencies that have jurisdiction over the property on which the project is located.0%DPRDDCEDC
    secondary_agencytextThe City agency or agencies that have jurisdiction over the property on which the project is located.69%DOTDPRQPL
    public_privatecategoricalIndicates if the project is open to the public or a private structure(s) that extends over City-owned land.0%PublicPublic and PrivatePrivateof 4
    project_typecategoricalThe major category that the project falls under.0%Landscape architectureArchitectureBuilding systems & Modif…of 15
    construction_typecategoricalThe scope of work proposed for a project.0%Installation of specific…ReconstructionConstructionof 18
    resultcategoricalDesign review is an iterative process and the Public Design Commission works to provide applicants with feedback and guidance so that their submissions can be approved in the shortest number of review cycles. Even if a submission is not formally acted upon by the Commission within a cycle, the Design Commission typically provides feedback that will help the agencies revise their proposal so that it may be approved the following month. Submissions that were commented upon but not acted upon may h0%CommentedApprovedApproved with conditionsof 13
    review_cyclescategoricalA review cycle is the time between the deadline for the filing of a submission to the Public Design Commission and the scheduled date of the next public meeting of the Commission.52%123of 5
    previous_year_submissiontextProject submission that was submitted in December of the previous year for a Design Review meeting in January of the current year.92%xof 1