From a 340-row sample across 9 columns.
project_id| project_id | description | client_agency | division | phase | projected_construction_completion | scope | dollar_amount | status |
|---|---|---|---|---|---|---|---|---|
| HWK700B | Reconstruction of Columbia Street Area Phase II (BED-768B) | TRANSPORTATION | Infrastructure | Design | 2024-07-14T00:00:00.000 | RECONSTRUCTION OF COLUMBIA STREET AREA PHASE II HAS BEEN DEVELOPED IN COORDINATION WITH NYCDEP BED-768B. IT INCLUDES ALL THE STREETS IN THAT PROJECT SOUTH OF HAMILTON AVE AND ALSO INCLUDES A SERIES OF STREETS IN THE NEIGHBORHOOD REQUIRING CAPITAL RECONSTRUCTION. PROPOSED WORK INCLUDES FULL RECONSTRUCTION OF SEVERAL BLOCKS ALONG WITH STREETSCAPE AND SAFETY IMPROVEMENTS AT A SERIES OF INTERSECTIONS. THE OVERALL PURPOSE OF THIS PROJECT IS TO BRING THE STREETS IN THIS AREA TO A STATE OF GOOD REPAIR IN CONJUNCTION WITH UTILITY REPLACEMENT AND TO PROVIDE SAFETY ENHANCEMENTS AT KEY LOCATIONS. |
The machine field names SoQL needs, with the publisher's own description of each.
| Field | Type | Description | Null | Values |
|---|---|---|---|---|
project_id | text | Project Identification Number | 0% | HWK700BDOTSEQ02DOTSEQ01 |
description | text | Project description indicating type(s) and/or location(s) | 0% | Pedestrian Ramp Rehabili…Pedestrian Ramp Rehabili…Prior Notice Sidewalks- … |
client_agency | categorical | Name of the agency to which a project belongs to | 0% | TRANSPORTATIONENVIRONMENTAL PROTECTIONPARKS & RECREATIONof 6 |
division | text | Nature of a project / Division at DDC that is in charge of the project: e.g.) Infrastructure / Public Buildings | 0% |
GET /api/datasets/rukc-mmqu GET /api/datasets/rukc-mmqu/quality GET /api/datasets/rukc-mmqu/related GET /api/columns?dataset=rukc-mmqu
| $30M to 100M |
| Active |
| BB05-01-A | GI - Cons of ROW Bioswales & Stormwwater GS in BB-005, Ph 1 | ENVIRONMENTAL PROTECTION | Infrastructure | Procurement | 2021-09-15T00:00:00.000 | GI - CONSTRUCTION OF ROW GI IN BB-005 PHASE I IN THE QUEENS BOROUGH. CONSTRUCTION OF ROW GREEN INFRASTRUCTURE IN TRIBUTARY AREA BB005 INCLUDES BIOSWALES, GREENSTRIPS, INFILTRATION BASINS AND STORMWATER GREENSTREETS. ROW BIOSWALES ARE VEGETATED SYSTEMS THAT MANAGE STORMWATER RUNOFF BY STORING, INFILTRATING AND EVAPOTRANSPIRATION ELIMINATING IT FROM THE CITY'S COMBINED SEWER SYSTEM. CONSTRUCTION INVOLVES EXCAVATION, BACKFILL OF BROKEN STONE AND ENGINEERED SOIL, CONSTRUCTION OF CONCRETE INLETS AND OUTLETS, CONCRETE CURBS AND HEADERS, SIDEWALK AND PLANTINGS WHICH MAY INCLUDE TREES. | $10M to 30M | Active |
| P-1SAND01 | STARLIGHT PARK PEDESTRIAN BRIDGE (P-1PBSTAR) | PARKS & RECREATION | Infrastructure | Construction | 2020-06-04T00:00:00.000 | STARLIGHT PARK - PEDESTRIAN BRIDGES, BRONX | $3M to 10M | Active |
| BB05-02-A | GI - Cons of ROW Bioswales & Stormwwater GS in BB-005, Ph 2 | ENVIRONMENTAL PROTECTION | Infrastructure | Design | 2021-09-15T00:00:00.000 | GI - CONSTRUCTION OF ROW GI IN BB-005 PHASE 2 IN THE QUEENS BOROUGH. CONSTRUCTION OF ROW GREEN INFRASTRUCTURE IN TRIBUTARY AREA BB005 INCLUDES BIOSWALES, GREENSTRIPS, INFILTRATION BASINS AND STORMWATER GREENSTREETS. ROW BIOSWALES ARE VEGETATED SYSTEMS THAT MANAGE STORMWATER RUNOFF BY STORING, INFILTRATING AND EVAPOTRANSPIRATION ELIMINATING IT FROM THE CITY'S COMBINED SEWER SYSTEM. CONSTRUCTION INVOLVES EXCAVATION, BACKFILL OF BROKEN STONE AND ENGINEERED SOIL, CONSTRUCTION OF CONCRETE INLETS AND OUTLETS, CONCRETE CURBS AND HEADERS, SIDEWALK AND PLANTINGS WHICH MAY INCLUDE TREES. | $10M to 30M | Active |
| BED778A | Trunk & Dist WM Rep in Atlantic Ave b/t Carlton & Portland | ENVIRONMENTAL PROTECTION | Infrastructure | Procurement | 2021-04-11T00:00:00.000 | Trunk and Distribution Water Mains Replacement in Atlantic Avenue between Carlton Avenue and Portland Avenue in the Borough of Brooklyn. Water Main (WM-6) in: 1. Atlantic Avenue from Carlton Avenue to South Portland Avenue. 2. Intersection of Atlantic Avenue and Carlton Avenue. Water Main(WM -1) in: 1. Atlantic Avenue(SS) from Carlton Avenue to South Portland Avenue 2. Intersection of Atlantic Avenue and Carlton Avenue 3. Intersection of Atlantic Avenue and Cumberland Street. | $10M to 30M | Active |
| P-1STARLP | BRONX RIVER GREENWAY: STARLIGHT PARK PHASE II, STAGE 2, BX | PARKS & RECREATION | Infrastructure | Construction | 2021-06-01T00:00:00.000 | BRONX RIVER GREENWAY - STARLIGHT PARK PHASE II, STAGE 2, BRONX | $30M to 100M | Active |
| BED798 | 72" Replacement in Flatbush Avenue between Sterling Pl & 8th | ENVIRONMENTAL PROTECTION | Infrastructure | Construction | 2021-07-12T00:00:00.000 | 72" Trunk Water Main and Combined Sewer Replacement in Flatbush Ave. between Sterling Pl. and 8th Ave., etc., Borough of Brooklyn. WM-6 in: 1. Flatbush Ave. between Park Place and 8th Ave 2. 8th Ave. between Flatbush Ave. and Lincoln Place 3. Park Place between 5th Ave. and 6th Avenue 4. St. Johns Place between 5th Ave. and 8th Ave 5. 6th Avenue between Park Place and Union Street WM-1 in: 1. Flatbush Avenue between Park Place and 8th Avenue Combined sewer in: 1. Park Place between 5th Ave. and 6th Avenue 2. St. Johns Place between 5th Ave. and Flatbush Ave. 3. 6th Avenue between Park Place and Union Street 4. 8th Ave. between St. John's Place and Lincoln Place Additional scope: Reconstruction of triangle at 8th Avenue and Flatbush Avenue removed from HWK300-01 and to be constructed under the BED-798. | $30M to 100M | Active |
| BED809 | Replacement of Water Mains in Avenue S | ENVIRONMENTAL PROTECTION | Infrastructure | Construction | 2021-09-21T00:00:00.000 | RECONSTRUCTION OF WATER MAIN IN AVENUE S, BK | $10M to 30M | Active |
| BED819 | WM replacement in Oriental Blvd | ENVIRONMENTAL PROTECTION | Infrastructure | Procurement | 2022-07-28T00:00:00.000 | WATERMAIN REPLACEMENT IN ORIENTAL BLVD, BROOKLYN | $30M to 100M | Active |
| BED-827 | Regulator Chamber Roof Replacements | ENVIRONMENTAL PROTECTION | Infrastructure | Design | 2022-02-08T00:00:00.000 | REGULATOR CHAMBER ROOF REPLACEMENTS: BROOKLYN (5), BRONX (1). FIVE REGULATOR LOCATIONS IN BROOKLYN AND ONE REGULATOR LOCATION IN THE BRONX WILL HAVE THEIR EXISTING CONCRETE SLAB ROOFS REMOVED AND REPLACED WITH NEWLY POURED ROOFS SO THAT ACCESS COVERS ARE APPROPRIATELY CENTERED OVER DISTRIBUTION ASSETS. THIS WORK WILL INCLUDE THE DESIGN AND CONSTRUCTION OF STRUCTURAL STEEL SUPPORTING THE CONCRETE ROOFS. | $1M or less | Active |
Infrastructureof 1 |
phase | categorical | A particular stage in project process | 0% | DesignConstructionProcurementof 6 |
projected_construction_completion | datetime | Projected date for the completion of a construction or a project | 0% | 2024-09-13T00:00:00.0002023-08-14T00:00:00.0002021-06-26T00:00:00.000 |
scope | text | Similar to or more detailed project description | 0% | REHABILITATION (REPAIR A…RECONSTRUCTION OF EXISTI…RECONSTRUCTION OF COLUMB… |
dollar_amount | categorical | Rough estimate of project cost | 0% | $3M to 10M$10M to 30M$30M to 100Mof 7 |
status | text | Simple status of a project | 0% | Activeof 1 |